PHASE 1 — FOUNDATIONS
──
PHASE 2 — MINIMUM VIABLE SYSTEM
──
PHASE 3 — SIMULATION
──
PHASE 4 — REAL-WORLD DEPLOYMENT
INTEGRAL COLLECTIVE // OPEN SOURCE

INTEGRAL

A Federated, Post-Monetary, Cybernetic Cooperative Economic System

Modern economic failure is structural, not moral. Integral replaces competitive markets with a federated architecture of democratic governance, open design, cooperative production, honest contribution accounting, and real-time ecological feedback — operating without money, hierarchy, or centralized control.

integral-node-01 // system.init
$integral status --all
CDScollaborative_decision_system[ INIT ]
OADopen_access_design[ INIT ]
ITCintegral_time_credits[ INIT ]
COScooperative_org_system[ INIT ]
FRSfeedback_review_system[ INIT ]

$itc.ledger --recent
2025-12-14T09:12:04ZLABOR_EVENTparticipant:ada+3.2 cr
2025-12-14T11:33:17ZDECAY_APPLIEDnode:all_balances-0.4%
2025-12-14T14:07:52ZACCESS_REDEEMEDparticipant:ryo-5.0 cr

$frs.signal --latest
FINDING:ecological_flag_trend[ MODERATE ]
→ CDSpolicy_review_prompt dispatched
01 // CDS
COLLABORATIVE
DECISION SYSTEM
Democratic governance. Issues are raised, deliberated, decided, and dispatched — with a complete, tamper-evident record.
Explore
02 // OAD
OPEN ACCESS
DESIGN
Shared design commons. Blueprints are open, ecologically assessed, version-controlled, and certified before production.
Explore
03 // ITC
INTEGRAL TIME
CREDITS
Contribution accounting without money. Non-transferable. Decaying. Reflecting real labor, materials, and ecological cost.
Explore
04 // COS
COOPERATIVE
ORGANIZATION
The engine room. Production plans, task coordination, materials management, and quality assurance — all ledgered.
Explore
05 // FRS
FEEDBACK &
REVIEW SYSTEM
The adaptive nervous system. Reads reality, diagnoses drift, routes recommendations, closes the cybernetic loop.
Explore
CDS GOVERNANCE OAD DESIGN ITC CREDITS COS PRODUCTION FRS FEEDBACK feedback loop mandates labor events signals

FIVE SYSTEMS.
ONE LOOP.

The cybernetic core

A community decision in CDS authorizes a design in OAD. That design enters production through COS, generating labor and materials data. ITC converts that data into contribution credits. FRS reads the operational reality and returns findings to CDS — closing the loop.

This is not a market. Not a hierarchy. A system that governs itself through feedback.

PROTO-NODE NETWORK // LIVE MAP

WHERE WILL
THE FIRST NODES
EMERGE?

Communities registering as proto-nodes are preparing the organizational and cultural foundations that the software will eventually run on. You do not need to wait for the software to begin.

04 Communities registered // Phase-1

FOLLOW THE
BUILD.

Project updates, phase transitions, new documents, and conference announcements. Low volume. No noise.

// Subscription could not be saved. Please try again.
// Subscription confirmed. Welcome to the list.